Two guys, five hours, set up, bolted down, completely awesome, only had to drill out one hole.He did a really good job planting the anchors during the floor pour. I was absolutely certain we'd spend more time on alignment problems then on actually raising steel. But it went almost perfect. Very cool. Scaffolding by S&L, and I've no clue how we'd have done the job without it. We just lowered the ridge pole onto the scaffold from the top of the cut-out hill, wheeled it into place, raised it to the right height with 2X12 scrap left over from the footer frames, and then bolted the beams to it. Not easy, but pretty simple.
I'm gonna go collapse in the shade now.